MV Agusta Forum banner

1 - 5 of 5 Posts

·
Registered
Joined
·
6 Posts
Discussion Starter #1
Not sure how accurate this is but just got off the phone and according to my dealer here in MA, The good ol US of A will be recieving a total of 9 Oro's and 56 Base F3's during this first cut. Also told me that the plan it to have them start drop shipping (or whatever the term he used was) in the next 10-14 days as he heard MV want to get them out here ahead of the scheduled date of the panigale's arrival (I think he said the 27th FWIW). Assuming he is not full of it, we should start getting out bikes before May.
 

·
Registered
Joined
·
352 Posts
Not sure how accurate this is but just got off the phone and according to my dealer here in MA, The good ol US of A will be recieving a total of 9 Oro's and 56 Base F3's during this first cut. Also told me that the plan it to have them start drop shipping (or whatever the term he used was) in the next 10-14 days as he heard MV want to get them out here ahead of the scheduled date of the panigale's arrival (I think he said the 27th FWIW). Assuming he is not full of it, we should start getting out bikes before May.
I was told by the same dealer that they'll probably start getting 2 bikes each month from May onwards, until their 6 pre-orders are fulfilled.

I have my pre-order with another dealer though and I was told that participating dealer have been allotted 6 pre-orders each (including the Oro) and a total of 121 bikes will be imported into US. Anyhow, I can't wait to see mine, expecting arrival in June.
 

·
Registered
Joined
·
6 Posts
Discussion Starter #3
The wait has been so long, I am itching to ride (no wheels currently) so much so that I am contemplating taking an 848 evo Corse se which I can ride off with in the next few days. GRRRR
 

·
Registered
Joined
·
51 Posts
Not sure how accurate this is but just got off the phone and according to my dealer here in MA, The good ol US of A will be recieving a total of 9 Oro's and 56 Base F3's during this first cut. Also told me that the plan it to have them start drop shipping (or whatever the term he used was) in the next 10-14 days as he heard MV want to get them out here ahead of the scheduled date of the panigale's arrival (I think he said the 27th FWIW). Assuming he is not full of it, we should start getting out bikes before May.

This would be nice but the way it's been going I doubt it. My dealer has no answers right now so it's just a waiting game. I don't want to be one that calls every few days so if nothing happens by the end of April I'll call him up to see if there's any updates.
 
1 - 5 of 5 Posts
Top